August 13, 2026
by Alto Hartley
The walk-in arrives three weeks before the slab is poured. The hood cannot be set until a revised gas riser clears inspection. Two trades are scheduled in the same room on the same morning. None of these is a catastrophic failure. But together, they push the opening back a month and shift the overage to […]
Read More ›